Quality & Safety

Tested, Certified and
Built with Discipline

From factory acceptance testing to inspection protocols and certifications, every solution is built with quality at the core.

Quality Commitment

Our Commitment to Excellence

Quality at Unity Electro is not a department — it is a discipline embedded across every stage of design, fabrication, testing and delivery. We hold ourselves to the highest international standards because the infrastructure our products serve demands nothing less.

Thorough Pre-Delivery Checks

Every manufactured unit undergoes thorough quality checks before leaving our facilities — including dimensional inspection, electrical testing and documentation review.

International Standard Compliance

All products are designed and manufactured in compliance with international electrical and safety standards, including IEC 61439, EN 1090 and Singapore regulatory requirements.

Continuous Staff Training

Our workforce undergoes continuous training in quality procedures, workplace safety and technical skills — ensuring every team member contributes to our quality outcomes.

Safety & Environmental Responsibility

Certified under ISO 45001 and ISO 14001, we maintain a structured approach to workplace safety and environmental responsibility across all manufacturing operations.

Quality inspection at Unity Electro
Quality Assurance

Factory Acceptance Testing (FAT)

Every electrical panel and switchboard undergoes a comprehensive FAT programme before delivery — giving clients full confidence in performance, safety and compliance under real operating conditions.

Factory Acceptance Testing process
STEP 01

Pre-Test Verification

Physical inspection of the panel assembly — checking wiring, labelling, component ratings, busbar sizing and documentation against approved drawings and project specifications.

STEP 02

Insulation Resistance

High-voltage insulation resistance tests on all busbars and circuits to verify dielectric integrity before energising — ensuring no insulation breakdown under operating voltage.

STEP 03

Functional Simulation

Full simulation of operational sequences — protection relays, interlocking logic, metering, alarms and control functions verified against the project specification and SLD.

STEP 04

Client Sign-Off

Client or third-party inspector witnesses and signs off the completed FAT. Full test reports, certificates and as-built documentation provided for project records.

Quality You Can Verify

Request our certification documents or discuss your quality requirements with our engineering team.